Yesterday I painted the stairs! My back is angry about all the bending, but they look so fresh and clean. I almost hate to put back the plants that usually live there.
Out bathroom glass finally got installed. I'm just two days away from being able to shower in my own bathroom again. The guys showed up the first time and turned right around and left after looking at the stairs. They came back on Wednesday with two extra guys to help carry it up to the third story where the main bath is located.
A fresh lifeguard stand is a sure sign that summer is right around the corner. The spring break crowds have been impressive. They aren't up at sunrise though, so no photos of crowded beaches to share.
I have been savoring our daily sunrise beach walk during the break. I am going to miss that when school starts again on Monday. Just nine more weeks though. I think I will make it!
The Tiny Tuesday Sampler is on the frame. I am doing a tiny wave in the background and then minimal quilting in the colored areas of the blocks to knock down the puffiness. I think I'm about halfway done. I used a pieced section in the center of the backing and that has just shown up. I was just too tired yesterday to stand at the frame and settled for some hand quilting instead. Just two more days of break though, I am determined to make the most of it.